Transportation
Air Quality Conformity Analysis
- Conformity Analysis (July 2010) (291k pdf)
Atwater Merced Expressway (AME)
Project Design - October 22, 2010
- Phase 1A Map - Reduced (7.27mb pdf)
- Phase 1A Map (7.27mb pdf)
Castle Commercial Center Presentation - June 17, 2009
FINAL Environmental Impact Report - February 2009
- Cover (53k pdf)
- Table of Contents (59k pdf)
- Introduction (84k pdf)
- Comments and Responses (12mb pdf)
- Errata and Changes(3mb pdf)
- Mitigation Monitoring Reporting Program (251k pdf)
- Appendix A - Materials Received at FEIR Hearing
(due to file size, it cannot be posted to the web, but copies are available in our office.)- Appendix B - Attachments to Letter 5 (2mb pdf)
- Appendix C - Attachments to Letter 12 (246k pdf)
- Appendix D - AME Affected Parcels (51k pdf)
DRAFT FINAL Report TRAFFIC ANALYSIS FOR THE ATWATER-MERCED EXPRESSWAY PROJECT
February 8, 2007
- View Draft Final Traffic Report (6.88mb pdf)
Bicycle Plan
- Merced County Regional Bicycle Transportation Plan - Oct. 2008
Submitted to Caltrans November 4, 2008 (5.41mb pdf)Congestion Mitigation Air Quality (CMAQ) Funding
- Local Cost-Effectiveness CMAQ Policy - May, 2007
- CMAQ Cost-Effectiveness Threshold Documentation for the 2011 FTIP – September 2010
Federal Obligation Annual Reports
- Annual Report FFY 09/10 (24k pdf)
Federal Transportation Improvement Program (FTIP)
Grouped Projects Backup Listings
2011 FTIP
- December 2011 - Availability of Draft Amendment Number 14 (Type 3) to the 2011 (FTIP)
- November 2011 - Availability of Draft Amendment Number 13 (Type 3) to the 2011 (FTIP)
- October 2011 - Availability of Draft Amendment Number 12 (Type 3) to the 2011 (FTIP)
- September 2011 - Availability of Draft Amendment Number 10 (Type 3) to the 2011 (FTIP)
- July 2011 - Availability of Draft Amendment Number 9 (Type 3) to the 2011 (FTIP)
- July 2011 - Administrative Modification Number 8 to the 2011 FSTIP
- June 2011 - Draft Amendment Number 7 to the 2011 FTIP and Corresponding Draft Conformity
Analysis for Interagency Consultation and Public Review (638k pdf)- April 2011 - Administrative Modification Number 6 to the 2011 FTIP (1.26mb pdf)
- March 2011 - Draft Amendment Number 5 to the 2011 FTIP (842k pdf)
- February 2011 - Draft Amendment Number 4 to the 2011 FTIP (1.51mb pdf)
- January 2011 - Withdrawl of Amendment Number 3 to the 2011 FTIP (301k pdf)
- December 2010 - Draft Amendment Number 3 to the 2011 FTIP (1.31mb pdf)
- November 2010 - Draft Amendment Number 2 to the 2011 FTIP (1018k pdf)
- July 2010 - Draft Amendment Number 1 to the 2011 FTIP (576k pdf)
- July 2010 - 2011 FTIP ( FINAL / Board Approved)
View - Part 1 | Part 2 | Part 3
- April 2010 - Draft 2011 FTIP, Draft 2011 RTP, Draft EIR, and Corresponding Draft Conformity Analysis for Interagency Consultation and Public Review
Presentations
- Transportation for Tomorrow - January 2008
Presentation by the National Surface Transportation Policy and Revenue Study Commission (7mb pdf)Public Participation in the Transportation Planning Process
- Public Participation Plan - Public Draft August 2, 2011 (49k pdf)
- Public Participation Plan - February 2008 (45k pdf)
Regional Housing Needs
- Merced County Regional Housing Needs Allocation Plan
January 1, 2007 - June 30, 2014
Adopted August 21, 2008 (126k pdf)Regional Transportation Impact Fee (RTIF)
- RTIF Nexus Study - Updated January 2008 (1.15mb pdf)
- DRAFT RTIF Expanded Initial Study - January 2003 (333k pdf)
Regional Transportation Improvement Program (RTIP)
- 2012 Regional Transportation Improvement Program Adopted November 17, 2011 - Final Board Adopted Draft
- 2012 Regional Transportation Improvement Program Final Draft for Board Adoption - October 26, 2011
- 2010 Regional Transportation Improvement Program - Adopted January 21, 2010
- CTC-approved STIP Amendment 10S-045 - June 23, 2011
Regional Transportation Plan (RTP)
- 2011 Regional Transportation Plan (July 2010) (4.37 mb pdf)
- 2011 Regional Transportation Plan - Appendix G (San Joaquin Valley Overview) (July 2010) (2.40mb pdf)
- 2011 RTP Supplemental Environmental Impact Report (July 2010) (683k pdf)
- 2004 EIR - May 2004 (19.75mb pdf)
San Joaquin Valley Express Transit Study
- Final Report - May 2009 (23.7 mb pdf)
San Joaquin Valley Policy Council
Short Range Transit Plan (SRTP)
- FINAL Short Range Transit Plan - Sept. 2004 (913k pdf )
- Final Figure 1 - September 2004 (4.5mb pdf)
- Final Figure 2 - September 2004 (182k pdf)
- Final Figure 3 - September 2004 (1.2 mb pdf)
- Final Figure 4 - September 2004 (3.2mb pdf)
- Final Figure 5 - September 2004 (903k pdf)
- Final Figure 6 - September 2004 (719k pdf)
- Final Figure 7 - September 2004 (755k pdf)
- Existing Conditions - Appendix A - Sept. 2004 (20.1mb pdf)
- Survey Appendix B - Sept. 2004 (265k pdf)
- Survey Appendix B, Figure 1a - Sept. 2004 (7.06mb pdf)
- Survey Appendix B, Figure 1b - Sept. 2004 (6.50mb pdf)
- Survey Appendix B, Figure 1c - Sept. 2004 (4.8mb pdf)
- Survey Appendix B, Figure 2 - Sept. 2004 (20mb pdf)
- Survey Appendix B, Figure 3 - Sept. 2004 (20mb pdf)
- Survey Appendix B, Figure 4 - Sept. 2004 (20mb pdf)
- Survey Appendix B, Figure 5 - Sept. 2004 (20mb pdf)
- Survey Appendix B, Figure 6 - Sept. 2004 (20mb pdf)
- Survey Appendix B, Figure 7 - Sept. 2004 (20mb pdf)
- Survey Appendix A - Sept. 2004 (131k pdf)
- Draft Alt. Analysis Appendix C - Sept. 2004 (314k pdf)
- Alt. Analysis Appendix C, Map 1 - Sept. 2004 (512k pdf)
- Alt. Analysis Appendix C, Map 2 - Sept. 2004 (509k pdf)
- Alt. Analysis Appendix C, Map 3 - Sept. 2004 (515k pdf)
- Alt. Analysis Appendix C, Map 4 - Sept. 2004 (514k pdf)
- Alt. Analysis Appendix C, Map 5 - Sept. 2004 (512k pdf)
- Alt. Analysis Appendix C, Map 6 - Sept. 2004 (509k pdf)
- Alt. Analysis Appendix C, Map 7 - Sept. 2004 (515k pdf )
- Alt. Analysis Appendix C, Map 8 - Sept. 2004 (517k pdf)
- Alt. Analysis Appendix C, Map 9 - Sept. 2004 (508k pdf)
- Alt. Analysis Appendix C, Map 10 - Sept. 2004 (504k pdf)
- Alt. Analysis Appendix C, Map 11 - Sept. 2004 (517k pdf)
- Alt. Analysis Appendix C, Map 12 - Sept. 2004 (512k pdf)
- Alt. Analysis Appendix C, Map 13 - Sept. 2004 (240k pdf)
- Alt. Analysis Appendix C, Map 14 - Sept. 2004 (332k pdf)
- Alt. Analysis Appendix C, Map 15 - Sept. 2004 (483k pdf)
- Alt. Analysis Appendix C, Map 16 - Sept. 2004 (568k pdf)
- Alt. Analysis Appendix C, Map 17 - Sept. 2004 (563k pdf)
- Alt. Analysis Appendix C, Map 18 - Sept. 2004 (553k pdf)
- Alt. Analysis Appendix C, Map 19 - Sept. 2004 (290k pdf)
- Alt. Analysis Appendix C, Map 20 - Sept. 2004 (277k pdf)
- Alt. Analysis Appendix C, Map 21 - Sept. 2004 (311k pdf)
- Alt. Analysis Appendix C, Map 22 - Sept. 2004 (313k pdf)
- Alt. Analysis Appendix C, Map 23 - Sept. 2004 (314k pdf)
- Alt. Analysis Appendix C, Map 24 - Sept. 2004 (311k pdf)
- Route Descriptions Appendix D - Sept. 2004 (651k pdf)
Transit Joint Powers Authority for Merced County (TJPAMC) - Merced County Transit, TheBus
- Summary of Findings - September 2011
- Operations Analysis - Final Cover, Sept. 2003 (201k pdf)
- Operations Analysis - Chapter 1, Sept. 2003 (127k pdf)
- Operations Analysis - Chapter 2, Sept. 2003 (551 pdf)
- Operations Analysis - Chapter 3, Sept. 2003 (134k pdf)
- Operations Analysis - Chapter 4, Sept. 2003 (4mb pdf)