City of Merced

Planned Projects

Local Projects

The City of Merced will be working on the following projects in 2019. The following are now under construction or completed:

M Street Improvements

Improvements to M Street between Bear Creek and Rambler

CDBG Sidewalk at Rivera

Improvements to sidewalks at Rivera School and G Street Ramps, funded by Measure V and the Community Development Block Grant (CDBG)

CDBG Sidewalk at John Muir

Improvements to sidewalks at John Muir Elementary School funded by Measure V and the Community Development Block Grant (CDBG)

Westerly Bikepath

Construction of bikepath funded by Measure V and Congestion Mitigation and Air Quality grants (CMAQ)

The following projects are in planning:

M Street Overlay

R Street Overlay (Loughborough Dr to Yosemite Ave)

Alpine Drive Overlay (G Street to Wainwright Ave)

Canal Street Overlay

CMAQ (Congestion Mitigation and Air Quality Improvement) Project at John Muir Elementary School

CMAQ Project at Motel Drive

Highway 59 Traffic Signal

Right Turn Channelization

Regional Projects

Highway 59 Black Rascal Bridge

Widening of Black Rascal Bridge from two to four lanes. 

Highway 59 Phase 1 (16th to Olive)

Widening of Highway 59 from 16th to Olive with new sidewalks

CONTACT:

Ken Elwin, P.E. Public Works Director

(209) 385-6803

elwink@cityofmerced.org

1776 Grogan Avenue Merced, CA 95341

Member_Merced_Clean